Lifted and enclosed 24,000 square foot occupied warehouse, from 14' all the way up to 35' clear, without disrupting operations. S.T.I. avoided interim weather exposure by pre-installing wall enclosure and lifting it along with the roof. Client gained over a half-million cubic feet, enabling installation of high-rack storage and retrieval systems.
(Project featured in Long Island Business News)